There is a difference between swapping a suite and genuinely reconfiguring a room. A full refit means lifting the floor, and behind most old bathrooms we find rotten floorboards, failed or missing tanking, a previous owner's bodged pipework, and lead or old copper that needs replacing before anything new goes in.

A wet room lives or dies on the tanking underneath the tiles. We take the floor down, build the falls to the drain, and tank the whole wet area properly before a single tile goes on, because a wet room fitted quickly is the one that leaks into the room below.
A bathroom is small enough to stand in the middle of and touch every wall, and every trade still has to pass through it in turn. Plumber, electrician, plasterer, tiler, all working in the same few square metres, and the order they go in decides how the job runs. Get the sequencing wrong and a two week bathroom turns into a six week bathroom, with the family using next door's shower while the delay quietly adds up in the background. Running that order properly, first fix before boarding, boarding before tanking, tanking before tiling, is most of the job. It matters more than the fittings you eventually choose, and it is where a badly run bathroom starts to drag on.

An en suite or cloakroom rarely gets a room built for it. It usually comes out of a box room, the end of a landing, or a corner taken from the main bedroom, which means the soil pipe run and the door swing decide the layout before the fittings do, and the ceiling height often decides whether it can take a shower at all.

A bathroom in a loft conversion or an older property comes with its own problems: sloping ceilings that dictate where the shower can actually go, water that has to be pumped rather than gravity fed, and joists that were never sized with a bath in mind. We check all of it, and where the property sits for planning purposes, before we start pricing the work, not after the tiles are already up.

A strip out takes the room back to the floorboards and the brick, so we can see what is really there: the state of the joists, whether the old tanking failed, what the existing pipework is made of, and whether the soil pipe needs moving at all. Underfloor heating, new extraction and full rewiring of the bathroom circuit can all go in at this stage, while the floor is up and the walls are open, rather than being squeezed in later.
Moving the toilet means moving the soil pipe, and that decision drives the cost and the programme more than any tile or tap.
Tanking failure is the single most common bathroom disaster we get called to, usually surfacing years later.
Old houses bring their own problems: uneven floors, solid walls that resist chasing, and old pipework that needs boxing in, not ripping out.
We start by looking at what is actually there rather than guessing from a couple of photos. Our team comes out, lifts a board if needed, checks the joists, the existing pipework and whether the soil pipe can realistically stay where it is. A loft conversion bathroom needs a different conversation to a Victorian terrace bathroom with solid walls, and an older property needs its own conversation again, since work like this can throw up issues you simply would not get in a newer build. Once we know what we are actually dealing with, we agree the scope and the order of work with you before anything gets lifted.
Electrics in a bathroom follow strict zones around the bath and shower, and must be signed off by someone qualified.
Tiling only lasts if the substrate is flat, sound and waterproofed properly.
Extraction has to meet building regulations for ventilation, especially with no window or in a loft conversion.
We cover Suffolk, Norfolk and Cambridgeshire from our base in Bury St Edmunds, fitting bathrooms in towns such as Thetford, Newmarket and Stowmarket, as well as on Victorian terraces, 1930s semis and newer estate housing alike. It is the same team from the first visit through to snagging, so the people who looked at your bathroom are the people running it day to day, not a different subcontractor turning up once the deposit is banked. Get in touch with what you are dealing with, uneven floor, solid walls, only one bathroom in the house, and we will talk you through what it actually involves before you commit to anything.

A straightforward swap of a suite in the same layout usually runs one to two weeks. A full refit with a new floor, tanking and rewired circuits takes longer, and moving the soil pipe adds time again on top of that. We will give you a realistic figure once we have actually seen the room, not before.
Most bathroom work falls under building regulations, particularly electrics, drainage, ventilation and any work that touches the soil pipe. If you are in a conservation area there can be extra permissions to think about too. We handle that paperwork as part of running the job, so it gets dealt with rather than left for you to chase up afterwards.
Yes, but moving the toilet means moving the soil pipe, which is the single decision with the biggest effect on cost and programme. We will always tell you honestly whether keeping the original position saves you real time and disruption before you commit to shifting it.
A shower tray is quicker to fit and more forgiving if the floor below is not perfectly level. A wet room looks cleaner and suits an en suite well, but it depends entirely on proper tanking underneath, since a wet room with poor tanking is the most common bathroom failure there is.
We plan around it. That can mean sequencing the work so the toilet and basin go back in usable form earlier than the rest, or timing the most disruptive days for when the household can manage without one. Tell us early that it is your only bathroom and we will build the programme around that, not around what suits us on paper.
Tanking goes on before the tiles, across the whole wet area and up the walls to a proper height, well beyond the shower itself. It is the single most common thing that fails in bathrooms we get called back to fix, usually because it was rushed or skipped entirely the first time round.
Building regulations set minimum extraction rates for bathrooms, and a room with no opening window needs mechanical extraction to meet them properly. It matters even more in a loft conversion bathroom, where trapped moisture has nowhere else to go and can sit in the roof structure quietly rotting timber.
We are based in Bury St Edmunds and work across Suffolk, Norfolk and Cambridgeshire, covering towns such as Sudbury, Haverhill and Mildenhall. That covers Victorian terraces, 1930s semis and newer estate housing alike, so send us a few details about your bathroom and the property it is in, and we will tell you honestly what is involved before anything is agreed.